Drilling Offshore - A special kind of safety

When working offshore on either drilling rigs, production drilling platforms, jack-up drill rigs, or semi-submersible drill rigs, workers are faced with many different factors that increase their exposure to injury. This exposure increases even more during travel to and from offshore drill rigs. It is important that employees be alert to potentially dangerous circumstances, and take precautions that will lessen their risk of injury.

Some of these potentially dangerous hazards are: Poor Weather Conditions - Unlike many other jobs, weather conditions directly effect the safety of offshore drilling work. Wet, rainy weather may cause most construction companies to halt a project, but not offshore drilling operations. Drilling must go on!
Everyone must adapt to weather conditions and continue with normal procedures. And, when you're in the middle of the ocean on a multilevel platform with limited space, both weather and drilling can become dangerous: The surface of most offshore drill rigs is metal grating, which can become slippery when wet. High winds and driving rain can also reduce a worker's visibility and balance when working out of doors, leading to trip and fall injuries. Limited Space/Confined Work Quarters - Limited work space frequently increases exposure to accidents. Under these circumstances, equipment, machinery, and other workers create a potential for bumps, bruises and contusions, and striking injuries to the body.

 Four or five different contractors may be working on a drilling rig at the same time. Everyone must be aware of other crew members and avoid doing anything that will cause injury to others. For example, cooks in restaurants usually have adequate room to operate, but offshore galleys are often very confined. To avoid accidents, cooks and galley hands must be cautious when working with knives, heat and flame in these "tight" quarters.

Fatigue Factor - For most people in the workforce, a normal week is forty hours. Not drilling offshore! These drillers andworkers may put in more than eighty hours during one week. With twelve hour workdays, fatigue is inevitable and the potential for accidents and injuries increases. A sufficient amount of sleep (at least eight hours for most people) is required for a person's body to rest and recuperate. During rest breaks, workers should also replenish their system with lost fluids.

Potential for Violence in the Workplace - Most employees spend only about eight hours a day with co-workers. Not offshore drilling personnel! They not only work twelve hours with other employees but also eat, sleep, and relax in close quarters with these same employees, regardless of their degree of friendship. Too much "togetherness" can lead to tension, disagreement and personality conflicts between people. For everyone's sake, there should be no tolerance for fighting or violence in offshore drilling work environments--and all employees must be made aware of this. All employees must stay alert!

 The items just mentioned only scratch the surface of the many exposures to injury during offshore drilling operations. Other hazards include blowouts, fires, hazardous chemicals and gases, and piping pinch points. New employees may not appreciate the potential dangers of this environment.

Experienced drillers and workers may take this jobsite for granted and become careless. All employees need to be educated and trained to consistently work with care and caution. Working with caution doesn't mean slower production, it just means safer production!

What is Oil Well Drilling?

When oil drilling, a hole is drilled into the surface of the earth, that is created to retrieve petroleum oil hydrocarbons for us to use. In most cases, natural gas is produced along with the oil.
The well is produced by drilling a hole from anywhere from 5" - 40" in diameter into the earth with a drill rig, that rotates a drill string with a diamond core bit attached. Once the hole is completed, sections of steel pipe or otherwise known as casing,  that is slightly smaller in diameter than the borehole, are lowered into the hole. The casing provides structural integrity to the newly drilled well, and isolates any potentially dangerous high pressure zones from each other and the surface.
When these zones are safely isolated and the formation is protected by the casing, the oil well can be drilled deeper with a smaller drilling bit, and then cased with a smaller diameter casing. These wells typically have two to five sets of smaller diameter hole sizes drilled inside one another, each cemented with casing.

How to drill the oil well:

  • Drilling fluids,  or "drilling muds", are pumped down the inside of the drill rods and exit through the drilling bit. The main functions of the drilling muds include cooling the bit, lifting rock cuttings to the surface, stabilizing the rock in the borehole walls and overcoming the pressure of fluids inside the bedrock so that these fluids do not enter the borehole. The main components of drilling fluid are usually water and clay, but it also typically contain complex mixtures of fluids, solids and even chemicals that must be carefully calculated to provide the correct physical and chemical characteristics to safely drill the oil well. In some cases oil wells can be  drilled with air or foam as the drilling fluid, to cool the drill bit and carry the drill cuttings to surface.
  • The rock "cuttings" are carried up by the drilling fluid as it resurfaces outside the drill pipe. The fluid then goes through "shakers" which strain the cuttings from the good fluid and then returned to the mud pit. Watching for abnormalities in the returning cuttings and monitoring pit volume or rate of returning fluid is important to catch any "kicks" early. A "kick" is when the formation pressure at the depth of the bit is more than the hydrostatic head of the mud above, if this is not  controlled temporarily by closing the blowout preventers and ultimately by increasing the density of the drilling fluid would allow formation fluids / mud to come up through the annular space uncontrollably.
  • The rods or drill string that the bit is attached is gradually lengthened as the well gets deeper by adding additional 30-foot (9 m) sections of pipe under the topdrive of the drill rig at the surface. This is what they call in the industry as "making a connection". These connections can be combined for more efficient tripping of the rods when pulling out of the hole and creating stands of multiple connections. A conventional triple, would be to pull pipe out of the hole three connections at a time and stacking them in the derrick. Some modern rigs, called "super singles," trip pipe one at a time, laying it out on drill racks as they go.
This process is all done by a oil drilling rig which would contain the equipment to circulate the drilling fluid, hoist and turn the pipe, control downhole drilling, remove cuttings from the drilling fluid, and generate on-site power for all drilling operations.

What is Environmental Drilling?

Environmental drilling and sampling is generally done for phase II and phase III environmental assessments of commercial, government, and residential properties. This involves specialized drilling methods to advance through the soils and/or through the desired water table(s) for investigations of the soil and water. This is done to determine the presence and/or concentration of contaminants.

During environmental drilling, often montioring wells are installed to check water table anaylsis
Once contamination is encountered, a proper remediation can be done by either Ex-situ or In-situ methods.  Ex-situ methods involve excavation of the contaminated soils completely and back filled with clean soil or treated soil. In-situ methods seek to treat the contamination without removing the soils. This can be done by installing injection wells into the boreholes, where the chemical treatment is then pumped down the well intersecting with the contaminated soil or water table.

These investigations and treatments are vital to the human health and the health of the environment and all its living creatures. Keeping our soil and water table clean is important for drinking water if you are being supplied by a well. These tests performed by the environmental drilling process, allow us to keep the soil and water table clean by treating contamination when it is found.

Monitoring wells are commonly installed in the boreholes during the environmental drilling, which provide a solid pvc pipe casing the soil from collapsing. A slotted screen is installed at the bottom of this pvc pipe to allow the water table to flow into the well pipe. This provides a pur sample of water that can be extracted from the well and tested at different time intervals to determine the severity of the contamination on site. 


Most Importantly - Drilling Safety

Drilling of any type, on any drill rig, can be dangerous if you are not practicing your best safety on the drill. Not only are you dealing with a rotating shaft, that can rotate extremely fast at times, you are operating a heavy piece of machinery and dealing with extreme weather. 

I have designed a short list of some of the possible safety precautions you should take when operating a drill rig. This is just a few of many, hopefully everyone already follows these requirements at a minimum. For specific auger drilling  guidelines, visit my page Auger Drilling Safety Guidlines.

Drilling safety is always a concern on any drill rig. Be safe!
  • Drill crew must be present during all active operations.
  • Drill crew and other site personnel must know emergency shut off procedures.
  • Drill string should be fully guarded and drill crew trained on operation of guard.
  • Ensure jewelry is removed, loose clothing is buttoned and loose PPE is secured close to the body in order to avoid being caught in moving parts.
  • Unauthorized personnel must be kept clear of the drill rig.
  • Area of drilling operation must have proper delineator markings providing a prominent outline of the work zone.
  • When hazardous conditions are deemed present, operation must be shut down until it is safe to proceed.
  • Never climb the mast when it is erect.
  • Never mobilize the drill when the mast is erect.
  • Pipe, drill rods, casing, augers should be stacked to prevent spreading, rolling, or sliding.
  • Work areas, platforms, and walkways should be kept free of materials, debris, and obstructions such as ice, grease or oil that could make the surface slick or otherwise hazardous.
  • Shut down drill rig to make repairs or adjustments to drill rigor or to lubricate fittings.  Release all pressure on the hydraulic systems, the drilling fluids, engine fluids, and the air pressure systems of the drill rig equipment prior to performing maintenance.
  • For start up, all gear boxes must be in neutral, all hoist levers disengaged, all hydraulic levers are in the correct non-actuating positions.
  •  Before raising the mast, check for overhead obstructions.
  • Clean mud and grease from your boots before mounting a drill platform.  Watch for slippery ground when dismounting.
  • Always maintain a minimum clearance of 18 inches between the operating hand and the cathead drum when driving samples, casing, or other tools with the cat head and rope method.
  • Use a long handle shovel to move auger cuttings away from the auger.  
  • Obtain all locates that are legally required and that ensure your safety
  • Do not drill if you don't have all underground utilities located on your site.
These are a few of thousands of safety topics on construction or the drilling industry. For more drilling specific safety talk sheets and information, www.drill-safe.com has some of the most drilling safety information on the web.

Auger Drilling Safety Guidelines

Auger drilling uses direct power to rotate flighted augers into the ground. Drill rigs must have kill switches in operable condition. Familiarize yourself with their location and operation. At least two people should be present when operating this equipment. Do not wear loose clothing, jewelery and have long hair tied back during all operations. The  rotating auger string must have a rotation guard or physical barrier that is fixed to the equipment during rotation, though, when rotation stops it can be easily opened to access the drill string when required.


The drill operator and drill helper should set a system of responsibility for the various tasks required for auger drilling, such as adding or removing augers or using the auger fork. The drilling equipment should have a clutch lock out system in place to ensure the safety of workers during these tasks, though the drilling operator is responsible that everyone is away from the drill string and the guard is in place before drilling rotation is continued.

The following points are hazards that are unique to this style of drilling that you must be aware of before drilling.
    A list outlining ways to be a safer driller and to implement drilling safety
  • When cleaning the augers male and female connecting ends or auger bolt holes, never use your fingers, always use a wire brush to clean them out.
  • Allow the machine to hoist the the auger section on to the drill string, then connect.
  • Use the manufacturers recommended method of securing augers and securing the drive head to the augers.
  • Never place your hands or fingers at the bottom of the auger section while it is being hoisted onto the drill string or whenever hoisting augers,.Place your hands on the side of the augers if you must handle them.
  • Never allow your feet to be under a auger section during hoisting.
  • Only start to auger when the drill rig is stable and level, the clutch or hydraulic rotation control disengaged, the transmission in low gear, the engine running at low RPM, and rotation guard in place.
  • Any connecting pins on the augers should be low profile.
  • Use down pressure on the auger prior to rotation to bury the auger head as far down as possible into the ground.
  • When rotating augers, always have your auger guard in place, and always be aware of the rotating parts, never reach behind a guard to access rotating augers for any reason whatsoever.
  • Always look at the auger head when beginning rotation. Slowly engage clutch or rotation control to start rotation.
  • Slowly rotate your augers while continuing to apply down pressure. One hand should always be on the clutch or rotation control and one hand on the up/down lever.
  • If the drill string slides out of alignment during the beginning of the hole, disengage the drill string and repeat the borehole starting process.
  • Never place your hands between the drill and an auger, even if attempting to free sampling equipment from the auger.
  • Always use a long handled shovel when removing cuttings. All cuttings should be shoveled away when augers are inactive.
  • Augers should only be cleaned when the drill string is in neutral and augers have stopped rotating. The clutch lock out should be in place during this step.
  • When remoing augers, allow the drill to hoist the top auger from the drill string and on to the ground before uncoupling from the hoist.
  • Always clean and properly store all augers securely for safe transport.
Consider the following when using screw-together augers.
  • When coupling augers together, the clutch lock out should be in place, the drill should be at low idle, while screwing. Always remove auger fork before rotation.
  • When uncoupling the augers, always clean the area for the pipe wrench to attach properly.
  • With the clutch lock out in place, the helper can attach the pipe wrench in the proper postion and lightly hold onto a rope attached to the pipe wrench to maintain the tension.After breaking the auger the should stay clear until the clutch lock out is in place.
Consider the following when using bolt-together augers.
  • Never use bolts with worn threads or rounded heads
  • Don't use a worn out socket or breaker bar.
  • Pull on breaker bar to tighten, never push.
  • Clutch lock out should be in place and hands should be off of the controls when auger bolts are being fastened or loosened and when auger fork is being used.
  • If the top auger does not disengage from the drill string, hammer on the thick part of the female coupling end to loosen. Do not hammer on the flights or body of the auger.
  • If the auger bolts do not loosen with the appropriate wrench, tap the face of the bolt lightly with a hammer.
  • If the top cap does not disengage from the drill string, strike the cap with your hammer.
Consider the following when using solid-stem flight augers.
  • Place the J-pin so the movement of the soil cuttings up the flights, won't disengage the pin.
  • The clutch lock out should be in place and hands off of the controls when adding/removing augers, adding/removing J-pins and using the auger fork.
  • Use the proper hoist for lifting the augers.
This is a short list of safety guidelines to educate you on proper drilling procedures. This is not all of the possible hazards that are associated with this specific drilling procedure.

What is Diamond Core Drilling?

Diamond drilling is the process of drilling into the ground for exploration of deposits underground. Diamond drilling is carried out to locate mineral deposits on sites that may have a potential for mining operations.
Diamond core drilling, or rock coring is definitely the best method for finding these deposits and the only way to retrieve bedrock samples, of varying sizes, usually five or ten foot long samples at a time. The process of rock coring is fascinating and done surprisingly quickly with modern day tooling and technology.

 The use of a diamond encrusted drilling bit, water and high speed rotation, you can advance the casing or core into the bedrock. Watch this video of a diamond core drill, drilling bedrock from ground surface. The sample of rock is collected in a inner tube seated in the core barrel, which cab be extracted with the use of a wire line winch. This core sample is an undisturbed sample of the bedrock.


With high speed rotation and water as a flushing agent, as well as to cool the bit, the drill produces a "core" sample which then is extracted from depth, for examination. Geological site investigation is common in any area for studies of the Earth's formation or fractures in the earths rock layers. Environmental Site assessments are done by installing monitoring wells in the bedrock for future studies for water tables. Exploration diamond drilling is used in the mining industry to probe the contents of known ore deposits and potential sites. By withdrawing a small diameter core of rock from the ore body, geologists can analyze the core by chemical assay and conduct petrological and mineralogical studies of the rock.
This is a close up view of a diamond core drilling bit

Here is a chart showing the diameter sizes of which the rock is cored. Most rock coring tubes are in lengths of ten feet, but can also be done in five feet.
SizeHole (outside)
diameter, mm
Core (inside)
diameter, mm
AQ4827
BQ6036.5
NQ75.747.6
HQ9663.5
PQ122.685
CHD 7675.743.5
CHD 101101.363.5
CHD 134134.085.0